Auxilliary Facilities & Technical Services
Civil Engineering Group
Group Members
Mr. Raj Kumar
Engineer- G
[Program Leader]
Ext:319
Harshwardhan
Junior Engineer - E
Ext:406
Electrical & Power system
Incoming Power
IUAC is having 11 kV dual HT feeders as incomers from BSES Rajdhani Power Limited. One feeder is coming from Indian Institute of Mass Communication (IIMC) vis ICSSR and the other is coming from Grid-B, 66 kV sub-station in sector B- 5&6 Vasant Kunj. IUAC is having switching facility within our sub-station, between the two feeders in case of failure of any one feeder. The contract demand of IUAC is 1752 kVA and sanctioned load is 1921 kVA.
11kV, HT distribution
IUAC is having a total of 3 sub-stations including two outdoor Compact Sub-Stations (CSS). 11kV power is being distributed to 8 different distribution transformers through HT panels of 3 sub-stations consisting of OCB’s, VCB’s and SF6 circuit breakers, which converts 11 kV to 415 V AC for utilization. The total power of all 8 distribution transformers is 7100 kVA.
LT Power Distribution
LT power from all distribution transformers is being distributed across the campus through LT panels. Few major loads are listed here
- Central AC Plant-1 – having 4x250 TR chillers
- Central AC Plant-2 – having 1x200 TR chillers
- Central AC Plant-3 – having 1x250 TR chillers
- Liquid Helium Plant
- Pelletron Accelerator
- Param Rudra Data Centre
- High Current Injector Facility
- HYbrid Recoil Mass Analyser
Un-interrupted Power Supply Systems (UPS Systems)
IUAC is providing un-interrupted power to all major facilities by using following UPS Systems.
- 3x300 kVA UPS Systems synchronized and load sharing
- 3x200 kVA UPS Systems synchronized and load sharing
- 3x60 kVA UPS Systems synchronized and load sharing
- 3x60 kVA UPS Systems synchronized and load sharing
- 2x500 kVA UPS Systems synchronized and load sharing
- 2x150 kVA UPS Systems synchronized and load sharing
Roof-top Solar Power Plants
IUAC is having following roof-top solar power plants in its campus.
- 2x50 kWp Grid interactive solar power plant – Owned and maintained by IUAC
- 2x30 kWp, 1x50 kWp, 1x11 kWp – total 121 kWp solar plant power on RESCO model owned and maintained by a private company. IUAC is having power purchase agreement with them for 25 years.
- Further 400 kWp rooftop solar plant on RESCO model has been approved, and power purchase agreement has been signed with a private company.
D G Sets
IUAC is having 3 DG Sets of 750 kVA power rating each. All 3 sets are synchronized through PLC control panel. DG Sets provide power to all critical loads, UPS systems and lighting system during power failure from the grid.
Power Factor Correction Panels
IUAC is having following power factor correction panels in our distribution system for maintaining the power factor of our total load to unity.
Group Members
Mr. Raj Kumar
Engineer- G
[Program Leader]
Ext:319
Gaurav Singhal
Engineer - C
gaurav[dot]singhal[at]iuac[dot]res[dot]in
Ext:320
Mohd Arif Waqar
Junior Engineer - C
Ext:320
Mechanical Group − I & II
Air Conditioning System, Water System, STP, Compressed Air System, Elevator, Fire Fighting System, Supply of High Purity Gases to Laboratories and Cranes etc..
Group Members
Mr. Bishamber Kumar
Ext:405
Mechanical Group − III
Workshop, Welding shop etc.
Group Members
gajanan[at]iuac[dot]res[dot]in
Ext:8312