| Sl. No. | Indent Number | Details and Download |
|---|---|---|
| 1 | 465 |
Inter University Accelerator Centre (IUAC) requires “Supply, Installation, Testing and Commissioning of HCI Control Network Infrastructure, including Switches, Cables and Termination units” as per the technical specifications given in this document. Scope of Work: “Supply, Installation, Testing and Commissioning of HCI Control Network Infrastructure, Cables and Termination Units” Download ( 242.31 KB ) ( 30/10/2025 )
|